Ken Mattingly was moved within the help crew into parallel schooling with Anders as backup CMP in the event Apollo eleven was delayed past its meant July start date, at which position Anders would be unavailable.[59] Upon arrival on the Vertical Assembly Making, each phase was inspected in a https://tommyh183ige7.gigswiki.com/user