Installation Overview At a prominent confectionery site in York, Newsome has implemented a high-capacity 400 kW chiller, marking the noteworthy execution of the project. Designed to advance ESG targets, the installation boosts system dependability while cutting overall power consumption and CO₂ levels. https://bookmarkick.com/story20756735/advanced-400-kw-chiller-installation-achieves-fifty-thousand-pounds-yearly-energy-savings-and-200-tonnes-co%E2%82%82-saving